Posts Tagged ‘2012 Season’
Bates Motel and Haunted Hayride Build Updates

Bates Motel Castle gets an Extreme Makover
The Bates Motel build crew have been hard at work upgrading the Hayride Castle. We have added taller parapits, longer walls and new surprises! Here you can see Joe working on the framework to strengthen the structure.
Once the framework was completed, the entire structure was shot with a rigid foam coating to help preserve it and act as a canvas for carving the blocks and bringing the castle to life
Bates Motel gets Extreme Makeover
The build and design crew have been working all winter to renovate and improve the number one Haunted Attraction in America. They have ripped out five entire rooms and hallways and have plans in place to make this awesome attraction even better for 2012!
With the mild winter, we have been able to work inside the Haunted House (no heat) for the last several weeks, removing props, sets and wall panels in anticipation of major additions for the upcoming season. Some of the ideas we have conjured up are a high-tech haunted kitchen, basement and boiler scene and a highly detailed wine cellar. All these rooms will be outfitted with amazing scares and surprises. If anyone has any ideas for room design or would like to see something different, email us at info@thebatesmotel.com
Recent Comments